|
Shor, P. W. (2009). Quantum information theory: The bits don't add up. Nat. Phys., 5, 247–248.
Abstract: A counterexample to the 'additivity question', the most celebrated open problem in the mathematical theory of quantum information, casts doubt on the possibility of finding a simple expression for the information capacity of a quantum channel.
|
|
|
Esteban, E., & Serna, H. (2009). Quantum key distribution protocol with private-public key. arXiv, , 3.
Abstract: A quantum cryptographic protocol based in public key cryptography combinations and private key cryptography is presented. Unlike the BB84 protocol 1 and its many variants 2,3 two quantum channels are used. The present research does not make reconciliation mechanisms of information to derive the key. A three related system of key distribution are described.
|
|
|
Trabesinger, A. (2009). Quantum mechanics: Shaken foundations. Nat. Phys., 5(12), 863.
|
|
|
Polyakov, S. V., & Migdalla, A. L. (2009). Quantum radiometry. J. Modern Opt., 56(9), 1045–1052.
Abstract: We review radiometric techniques that take advantage of photon counting and stem from the quantum laws of nature. We present a brief history of metrological experiments and review the current state of experimental quantum radiometry.
|
|
|
Jackson, B. D., Hesper, R., Adema, J., Barkhof, J., Baryshev, A. M., Zijlstra, T., et al. (2009). Series production of state-of-the-art 602-720 GHz SIS receivers for band 9 of ALMA. In Proc. 20th Int. Symp. Space Terahertz Technol. (pp. 7–11).
Abstract: The Atacama Large Millimeter/Sub-millimeter Array (ALMA) requires the development and production of 73 state-of-the-art receivers for the 602-720 GHz range – the ALMA Band 9 cartridges. Development and pre-production of the first 8 cartridges was completed between 2003 and 2008, resulting in a cartridge design that meets the project's challenging requirements. The cartridge design remains essentially unchanged for production, while the production and test processes developed during pre-production have been fine-tuned to address the biggest new challenge for this phase – ramping up production to a rate of 2 cartridges per month over 2009-2012.
|
|